![]() When thinking about the actual price, it’s important to consider that unlike, say, drywall-much cheaper to buy, much harder to finish-a suspended ceiling requires no additional work once it is installed. There are numerous varieties-from a basic metal grid and drop-in panels to richly colored coffered looks that defy preconceived notions about how this ceiling treatment should look. Start with the look you want and work back to the budget you can afford. Decide on Look and Budgetĭeciding which drop ceiling is right for you depends on lots of factors. 5 Tips for Easier Drop Ceiling Installation 1. And while a manufacturer’s instructions are the best place to start, there are a few tools and tips “not shown” in the instructions that will make the project go smoother. You can install a drop ceiling yourself with a little effort and know how. So it pays to be careful with the details and spend a little time doing your homework before getting started. Also known as suspended ceilings, drop ceilings require careful layout and an ability to work efficiently overhead. Final inspection for the false ceiling works will be made by the Engineer and contractor and to be rectified to any comments given by them.Drop ceiling tiles are a popular choice for basements, offices and other spaces.After ensuring the ceiling boards/tiles were installed accordingly and acceptable flatness, sealing up of joints will proceed.Air terminal devices like grills or similar equipment shall be incorporated in the ceiling as specified. ![]() Upon completion of framing work including final adjustment to ensure entire suspension is level, the ceiling boards were then be fixed up at proper intervals.MEP clearance shall be obtained prior to commencing ceiling tile /gypsum board works.Access panels and MEP opening location to be determined and set according to approved shop drawings details. ![]() It shall be securely supported to prevent lateral movement.Where hangers cannot be fixed at the recommended spacing due to the presence of services, equipment or other obstructions, a sub-grid of appropriate span & performance shall be used with prior permission from the Customer.During these installation process MEP items installed were to be taken care, ensuring no damages.Leveling shall be carried out to prevent any subsequent download movement.Cross T-BAR will then be fixed in between all the Main-T-sections to its lock position perpendicular to it at sufficient intervals.Main –T-sections as per approved materials will then be tied to hangers at sufficient intervals.The hangers will be installed according to spacing and level required.All setting out shall be carried out according to the working / shop drawing.The grids shall be laid out as per reflected ceiling layout.Powder coated angles as per approved materials and section details of false ceilings will be fixed on level markings with screws and plugs.False Ceiling height in each area shall be marked in relation to the elevation of bench marks & transferred by water level.Proper working platform shall be provided for the safe access of works.Ensure that MEP services have been installed and clearance obtained from the concerned department.Ensure that setting out of fixing of MEP services and ceiling suspension system shall be similarly coordinated.Verify Layout of false ceiling tiles showing the position of cut tiles, pattern, etc are approved by the Engineer. ![]()
0 Comments
Leave a Reply. |